Add this copy of An Introduction to Critical Path Analysis to cart. $6.62, like new condition, Sold by Kennys.ie rated 4.0 out of 5 stars, ships from Galway, IRELAND.
Add this copy of An Introduction to Critical Path Analysis to cart. $9.90, fair condition, Sold by Anybook rated 4.0 out of 5 stars, ships from Lincoln, UNITED KINGDOM, published by Pitman.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
This book has hardback covers. Ex-library, With usual stamps and markings, In fair condition, suitable as a study copy. Dust Jacket in fair condition. Please note the Image in this listing is a stock photo and may not match the covers of the actual item, 400grams, ISBN:
Add this copy of An Introduction to Critical Path Analysis to cart. $10.90, fair condition, Sold by GuthrieBooks rated 4.0 out of 5 stars, ships from Spring Branch, TX, UNITED STATES, published 1969 by Sir Isaac Pitman & Sons.
Add this copy of An Introduction to Critical Path Analysis to cart. $11.20, good condition, Sold by Anybook rated 4.0 out of 5 stars, ships from Lincoln, UNITED KINGDOM, published 1969 by Sir Isaac Pitman & Sons.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
This is an ex-library book and may have the usual library/used-book markings inside. This book has hardback covers. In good all round condition. Dust jacket in fair condition. Please note the Image in this listing is a stock photo and may not match the covers of the actual item, 450grams, ISBN: 0273405446.
Add this copy of An Introduction to Critical Path Analysis to cart. $12.24, fair condition, Sold by Ladylisabooks rated 5.0 out of 5 stars, ships from Chester, , UNITED KINGDOM, published 1969 by Pitman.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
Used: Acceptable. Hardback with D/J in good condition. Ex library with first page removed. 3rd edition Pitman 1969. -used books, secondhand books, out of print books, hard to find books, for sale, second-hand books, college books, student books, nonfiction, first edition, signed copies, non-fiction books delivered world wide. Excess postage may be required for books over 1 kg in weight outside the EU. ISBN 0-273-40544-6 0273405446.
Add this copy of An Introduction to Critical Path Analysis to cart. $15.18, good condition, Sold by Anybook rated 4.0 out of 5 stars, ships from Lincoln, UNITED KINGDOM, published 1965 by Sir Isaac Pitman & Sons.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
This is an ex-library book and may have the usual library/used-book markings inside. This book has hardback covers. Clean from markings. In good all round condition. No dust jacket. Please note the Image in this listing is a stock photo and may not match the covers of the actual item, 350grams, ISBN:
Add this copy of An Introduction to Critical Path Analysis to cart. $15.31, fair condition, Sold by Anybook rated 4.0 out of 5 stars, ships from Lincoln, UNITED KINGDOM, published 1981 by Pitman Publishing.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
This is an ex-library book and may have the usual library/used-book markings inside. This book has soft covers. In fair condition, suitable as a study copy. Please note the Image in this listing is a stock photo and may not match the covers of the actual item, 400grams, ISBN: 0273011774.
Add this copy of Introduction to Critical Path Analysis to cart. $16.31, poor condition, Sold by Anybook rated 4.0 out of 5 stars, ships from Lincoln, UNITED KINGDOM, published 1977 by Pitman Publishing.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
This is an ex-library book and may have the usual library/used-book markings inside. This book has soft covers. In poor condition, suitable as a reading copy. Please note the Image in this listing is a stock photo and may not match the covers of the actual item, 350grams, ISBN: 0273011774.
Add this copy of An Introduction to Critical Path Analysis, to cart. $19.90, good condition, Sold by ThriftBooks-Baltimore rated 5.0 out of 5 stars, ships from Halethorpe, MD, UNITED STATES, published 1970 by Pitman.
Add this copy of An Introduction to Critical Path Analysis, 2nd Edition to cart. $41.11, good condition, Sold by BookDepart rated 4.0 out of 5 stars, ships from Shepherdstown, WV, UNITED STATES, published 1967 by Pitman.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
UsedGood. Hardcover, 2nd edition; surplus library copy with the usual stampings; refe rence number taped to dust jacket spine; light shelf wear, light fading to exterior; a few coffee-colored marks at bottom outside page edge; otherwise in good condition with clean text, firm binding. Dust jacket, light fading, light shelf wear; wrapped in protective Mylar sleeve.